HAZOP and QRA Study

a) HAZOP: Identify plant section on the P&I diagram; Define the design intent and normal operation conditions of the section deviation from design intent or operating conditions Identify possible causes for, and consequences of, the deviation action plan for addressing meaningful deviation that can result in harmful consequences consultation and discussion with stakeholders and preparation of HAZOP Report.

b) QRA: Reconnaissance survey, hazard identification, preparation of hazard indices, PHA analysis; Generation of release scenarios for accidental release of hazardous chemicals, fuels etc. computation of damage distances and consequence analysis computation of frequency of release scenarios assessment of risks and design of Risk Mitigation Measures and Plan.

c) ERDMP: Preparation and Certification of Emergency Response & Disaster Management Plan as per PNGRB regulations 2010 engaging Third Party Inspection Agency (TPIAs)